Sidewalk replacement on a South Florida street lined with palms

Right-of-way permit in the City of Fort Lauderdale

Last verified November 9, 2026 · Reviewed by Sarah Johnson

Sample photo

Agencies
1
Typical weeks (sample)
2–5
Documents
4
Inspections
1
Last checked
November 9, 2026

Short answer

Yes. Lane closures, sidewalk closures, dumpsters, cranes and construction work in a city street need a right-of-way permit with a maintenance of traffic plan.

Agencies, in order

  1. City of Fort Lauderdale: right-of-way permit

Documents checklist

PreparedForYes1

  • Maintenance of traffic (MOT) plan

You2

  • Certificate of insurance naming the city
  • Contractor licence and insurance certificate

Your design professional of record1

  • Site plan showing the closure limits

Steps

  1. Define the closure dates, hours and limits.
  2. Prepare the MOT plan for the street type.
  3. File, answer comments and pay the fees.
  4. Post notices before the closure and keep the permit on site.

Inspections

  • MOT setup check

Fees, reviewer comments and sources

Fees
  • Right-of-way permit fee, per day of closureSource: City of Fort Lauderdale: right-of-way permits[$___]
Common reviewer comments
  • Pedestrian detour is not ADA accessible.
  • Closure overlaps a special event.
Sources

Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.