Right‑of‑way permits
Driveway, sidewalk and closure permits filed in the right order, NCDOT first on state roads, so you can plan the pour.
Open in Raleigh and Wake County, Asheville and Buncombe County, and Charlotte. South Florida remotely, with local partners.
Sample content: prices, timelines and projects are examples.

- Our fee from (sample)
- $1,800
- Typical weeks (sample)
- 3–12
- Documents you send
- 2
- NCDOT step
- First, on state roads
From $1,800 per permit, plus agency fees at cost How pricing works
What's included
Scope
- Driveway aprons and commercial entrances
- Sidewalks, curb and gutter, curb cuts
- Right-of-way improvements tied to a development
- Road, lane and sidewalk closures
- Maintenance of traffic (MOT) permits for work in the street
What we do
- Site and drawing audit against what the agency asks for
- Street-maintenance check: NCDOT or city
- Package assembly: application, site plan markups, and the traffic control plan from the licensed partner
- NCDOT driveway permit or encroachment agreement before the city permit on state roads
- Filing, tracking and comment responses
- Inspection scheduling and restoration inspection follow-up
Not included
- Drawings and anything that needs a seal, including traffic control plans. A licensed partner, or your own design professional of record, prepares and seals them. We coordinate the work and check the package.
- Construction work in the field.
- Agency fees. They are passed through at cost and shown as an estimate in your quote.
- The agency's decision. The agency decides on approval; we make sure the package is complete and clear.
Documents we'll ask you for
You1
- Contractor licence and insurance certificate
Us1
- NCDOT permit application and follow-up, when the street is a state road (NCDOT decides)
Licensed partner3
- Site plan showing the work in the right-of-way
- Traffic control plan
- Restoration detail to the city standard
Property owner1
- Owner authorization
You send the site information. We assemble, check, file and track the package. Drawings and anything that needs a seal, including traffic control plans, are prepared and sealed by a licensed partner or your own design professional of record.
| Document | Who provides it |
|---|---|
| Site plan showing the work in the right-of-way | Licensed partner |
| Traffic control plan | Licensed partner |
| Contractor licence and insurance certificate | You |
| Owner authorization | Property owner |
| Restoration detail to the city standard | Licensed partner |
| NCDOT permit application and follow-up, when the street is a state road (NCDOT decides) | Us |
Steps and timing
- [01]Audit: We check the site, the drawings and who maintains the street.1–3 business days
- [02]Prepare: We build the package and fix what would come back.1–2 weeks
- [03]NCDOT (state roads): Driveway permit or encroachment agreement comes first.Sample: 2–6 weeks
- [04]City permit: We file, track the review and answer comments.Sample: 2–4 weeks
- [05]Inspect and close: We schedule inspections and close out the restoration.With your schedule
Sample project
New commercial driveway on a state road
NCDOT driveway permit first, then the City of Raleigh right-of-way permit. One comment round, answered in four days.
Read the projectRelated permit guides
- Driveway permit in the City of Raleigh right-of-way
- Sidewalk and curb cut permit in the Town of Cary
- Driveway permit in the City of Charlotte right-of-way
- NCDOT encroachment agreement for non-utility work
Do I need a permit?
Questions
How do I know if my street is a state road?
We check it in the audit. Many streets with a city name are maintained by NCDOT, and that changes the order of permits. Sample price: a state-road driveway in Raleigh is $1,800 base + $600 NCDOT step, plus agency fees at cost.
Do you prepare the traffic control plan?
No. A licensed partner, or your own design professional of record, prepares and seals them. We coordinate the work and check the package.
Can you handle several driveways on one project?
Yes. We file them together where the agency allows it and track each one in your portal.
What happens when the agency sends comments?
Most packages get at least one round. We draft the answers, tell you what we need from you, send sealed items to the licensed partner or your design professional of record, and resubmit.