
Permits, prepared right.Crews keep working.
North Carolina right-of-way and utility permits, checked first, so crews wait less.
Which permits does my project need?
Try “4100 US-1 Hwy, Raleigh” or “120 Main St, Asheville”.
Sample photo
Where the weeks go
One returned package costs about three weeks. We prepare first.
| Filed as-is | Agency review 4 weeks, Comments and resubmittal 2 weeks, Agency review 3 weeks; 9 weeks |
|---|---|
| Prepared first | Preparation 2 weeks, Agency review 4 weeks; 6 weeks |
about 3 weeks saved (sample)
How it works
- [01]
Audit
Site, drawings and who maintains the street.
- [02]
Package
Every form and sheet the agency asks for.
- [03]
File in order
NCDOT before the city, so your start date isn't lost to returns.
- [04]
Track and answer
We follow each review and answer every comment.
- [05]
Inspect and close
Inspections, punch list, TCO and CO, so the building opens on schedule.
Track every permit in one place
Status, comments, documents and the next step for every agency on your job, without phoning to ask.
Open the full demo880 Sample Pkwy, Wake County
Fiber crossing under a state road
- Intake
- Package
- Filed with NCDOT
- In review
- Comments
- Issued
- Inspections
- Closeout
We are assembling the encroachment package. The bore profile is with the licensed design partner; the checklist has 9 of 12 items in hand.
Needs youUpload the utility locate ticket
NCDOTNot filed yet
Kickoff done. Two things needed from you, both listed under Action needed.
- 44
- years in construction
- ~1,500
- projects from permit to CO
- 13
- years at City of Miami Public Works
- FL CGC
- Florida Certified General Contractor
Independent consultants. Not affiliated with any agency.
Sarah Johnson checks every package first, so fewer come back for missing sheets. About Sarah
Recent projects
Right-of-way · Raleigh, NCNew commercial driveway on a state roadIssued after 1 round · 65 days
Utility · Asheville, NCWater main repair and street restoration after HeleneIssued with no comments · 43 days
Right-of-way · Charlotte, NCSix-week lane closure for a mid‑rise buildIssued with no comments · 53 days
Sample projects. Details changed.
Who we work with

Developers
Approvals planned before the schedule depends on them.
Learn more: Developers
General contractors
Permits handled so the crew keeps working.
Learn more: General contractors
Utility contractors
Utility cuts and closures packaged complete, so fewer crews sit parked.
Learn more: Utility contractors
Architects and design firms
We audit your set before submittal, so comment rounds don't eat your fee.
Learn more: Architects and design firms
Small businesses
A sidewalk patio, a new driveway for the shop, an open permit before a sale. One job is enough.
Learn more: Small businesses


