Public works right-of-way permit in unincorporated Miami-Dade County
Last verified November 10, 2026 · Reviewed by Sarah Johnson
Sample photo
- Agencies
- 1
- Typical weeks (sample)
- 3–6
- Documents
- 5
- Inspections
- 2
- Last checked
- November 10, 2026
Short answer
Yes. Driveways, sidewalks, drainage and other work in a county right-of-way need a public works permit. State roads are permitted by FDOT instead.
Agencies, in order
- Miami-Dade County: public works right-of-way permit
Documents checklist
You2
- Property owner's authorization
- Contractor licence and insurance certificate
Licensed partner3
- Paving and drainage plan
- Survey of the right-of-way
- Traffic control plan for work in the street
Steps
- Confirm the road is county-maintained, not state or city.
- Prepare the plan set and traffic control plan.
- File online, answer comments and pay the fees.
- Build, pass inspections and close the permit.
Inspections
- Subgrade and base
- Final right-of-way inspection
Fees, reviewer comments and sources
Fees
- Public works permit feeSource: Miami-Dade County: public works permits[$___]
Common reviewer comments
- Drainage calculations are missing for the new driveway.
- Survey is older than allowed.
Sources
- Miami-Dade County: public works permits · checked November 10, 2026
Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.