
Public works right-of-way permit in the City of Miami (handled with a licensed partner)
Last verified November 6, 2026 · Reviewed by Sarah Johnson
Sample photo
- Agencies
- 1
- Typical weeks (sample)
- 3–6
- Documents
- 5
- Inspections
- 2
- Last checked
- November 6, 2026
Short answer
Yes. Work in a City of Miami right-of-way needs a public works permit. Handled with a licensed partner: our partner files and talks with the City; we prepare and check the package.
Agencies, in order
- City of Miami: public works permit (filed by our partner)
Documents checklist
You2
- Agent authorization for our partner
- Contractor licence and insurance certificate
Licensed partner3
- Paving, grading and drainage plan
- Survey of the right-of-way
- Traffic control plan for work in the street
Steps
- We prepare and check the package.
- Our licensed partner files it and handles all contact with the City.
- We draft comment responses; the partner submits them.
- The partner schedules inspections and closes the permit.
Inspections
- Base and forms
- Final right-of-way inspection
Fees, reviewer comments and sources
Fees
- Public works permit feeSource: City of Miami: public works[$___]
Common reviewer comments
- Show the swale and drainage restoration.
- Maintenance of traffic plan is missing.
Sources
- City of Miami: public works · checked November 6, 2026
Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.