Short answer

Yes, once land disturbance passes the County's threshold [check current threshold]. You need an approved erosion and sediment control plan before grading, and inspectors check the measures during the work.

Steps

  1. Measure the disturbed area, including stockpiles and access.
  2. Have the erosion and sediment control plan prepared and submitted.
  3. Pay the plan review fee [$___].
  4. Install silt fence, inlet protection and the construction entrance first.
  5. Keep measures maintained until the site is stabilized.