Short answer

Usually. Land disturbance above the county threshold needs an erosion and sedimentation control plan approval, and larger sites also need state construction stormwater coverage.

Agencies, in order

  1. Wake County: land disturbance permit

Documents checklist

PreparedForYes1

  • Construction stormwater (NPDES) coverage application (the state issues it)

You1

  • Financial responsibility form

Licensed partner2

  • Erosion and sedimentation control plan
  • Stormwater management plan

Steps

  1. Measure the disturbed area and check the county threshold.
  2. Prepare the erosion control and stormwater plans.
  3. File with the county and answer comments.
  4. Get state stormwater coverage and hold the pre-construction meeting.

Inspections

  • Erosion control measures installed
  • Final stabilization

Fees, reviewer comments and sources

Fees
  • Plan review fee, per disturbed acreSource: Wake County: erosion and sedimentation control[$___]
Common reviewer comments
  • Silt fence is missing on the downhill side.
  • Construction entrance detail is not shown.
Sources

Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.