Post-construction stormwater approval in Wake County
Last verified November 6, 2026 · Reviewed by Sarah Johnson
Sample photo
- Agencies
- 1
- Typical weeks (sample)
- 4–8
- Documents
- 4
- Inspections
- 2
- Last checked
- November 6, 2026
Short answer
For most new development, yes. Sites that add impervious area above the county limit need a stormwater management plan, a recorded maintenance agreement and an as-built certification at closeout.
Agencies, in order
- Wake County: stormwater management permit
Documents checklist
PreparedForYes1
- Easement plat recording for the control measure (prepared by a licensed surveyor)
You1
- Operation and maintenance agreement
Licensed partner2
- Stormwater management plan and calculations
- As-built certification
Steps
- Calculate new impervious area against the county limit.
- Prepare the stormwater plan with the design professional of record.
- File, answer comments and record the maintenance agreement.
- Build the control measure and submit the as-built certification.
Inspections
- Control measure during construction
- Final and as-built review
Fees, reviewer comments and sources
Fees
- Stormwater plan review feeSource: Wake County: stormwater management[$___]
Common reviewer comments
- Maintenance agreement is not recorded.
- Drainage area map does not match the calculations.
Sources
- Wake County: stormwater management · checked November 6, 2026
Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.