Post-construction stormwater approval in Wake County

Last verified November 6, 2026 · Reviewed by Sarah Johnson

Sample photo

Agencies
1
Typical weeks (sample)
4–8
Documents
4
Inspections
2
Last checked
November 6, 2026

Short answer

For most new development, yes. Sites that add impervious area above the county limit need a stormwater management plan, a recorded maintenance agreement and an as-built certification at closeout.

Agencies, in order

  1. Wake County: stormwater management permit

Documents checklist

PreparedForYes1

  • Easement plat recording for the control measure (prepared by a licensed surveyor)

You1

  • Operation and maintenance agreement

Licensed partner2

  • Stormwater management plan and calculations
  • As-built certification

Steps

  1. Calculate new impervious area against the county limit.
  2. Prepare the stormwater plan with the design professional of record.
  3. File, answer comments and record the maintenance agreement.
  4. Build the control measure and submit the as-built certification.

Inspections

  • Control measure during construction
  • Final and as-built review

Fees, reviewer comments and sources

Fees
  • Stormwater plan review feeSource: Wake County: stormwater management[$___]
Common reviewer comments
  • Maintenance agreement is not recorded.
  • Drainage area map does not match the calculations.