Silt fence and erosion control on a steep mountain lot

Erosion and sedimentation control permit in Buncombe County

Last verified November 7, 2026 · Reviewed by Sarah Johnson

Sample photo

Agencies
1
Typical weeks (sample)
4–8
Documents
4
Inspections
2
Last checked
November 7, 2026

Short answer

Usually. Grading above the county threshold needs an approved erosion and sedimentation control plan before any land is disturbed. Steep slopes in Buncombe County get extra review.

Agencies, in order

  1. Buncombe County: grading and erosion control permit

Documents checklist

PreparedForYes1

  • Construction stormwater (NPDES) coverage application (the state issues it)

You1

  • Financial responsibility form

Licensed partner2

  • Erosion and sedimentation control plan
  • Slope analysis for steep sites

Steps

  1. Measure the disturbed area and the slopes.
  2. Prepare the erosion control plan.
  3. File with the county and answer comments.
  4. Install measures before grading and keep the inspection log.

Inspections

  • Measures installed before land disturbance
  • Final stabilization

Fees, reviewer comments and sources

Fees
  • Plan review fee, per disturbed acreSource: Buncombe County: erosion control[$___]
Common reviewer comments
  • Slope stabilization is missing for slopes steeper than allowed.
  • Sediment basin is undersized for the drainage area.
Sources

Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.