Silt fence and erosion control on a steep mountain lot

Final right-of-way restoration inspection, Asheville

Last verified Nov 5, 2026 · Reviewed by Sarah Johnson

Sample photo

Items checked
5
Common fails
4

After utility or excavation work, the right-of-way must be put back as the approved detail shows. The permit does not close until this inspection passes.

What the inspector checks

  • Pavement patch matches the approved detail
  • Compaction test results on hand
  • Striping and markings restored
  • Curb and sidewalk repaired
  • Traffic control and erosion control removed

Common reasons it fails

  • Patch smaller than the required trench overlap
  • No compaction reports
  • Markings not restored
  • Signs left in the right-of-way

How to schedule

Request it when restoration is complete; have compaction reports ready [check current process].

Related question: Do I need an NCDOT encroachment agreement for a utility cut on a state road?

Example content, not verified. Every page is checked and approved by Sarah Johnson before it goes live.