Final right-of-way restoration inspection, Asheville
Last verified Nov 5, 2026 · Reviewed by Sarah Johnson
Sample photo
- Items checked
- 5
- Common fails
- 4
After utility or excavation work, the right-of-way must be put back as the approved detail shows. The permit does not close until this inspection passes.
What the inspector checks
- Pavement patch matches the approved detail
- Compaction test results on hand
- Striping and markings restored
- Curb and sidewalk repaired
- Traffic control and erosion control removed
Common reasons it fails
- Patch smaller than the required trench overlap
- No compaction reports
- Markings not restored
- Signs left in the right-of-way
How to schedule
Request it when restoration is complete; have compaction reports ready [check current process].
Related question: Do I need an NCDOT encroachment agreement for a utility cut on a state road?