Fire line connection and flow test in the City of Raleigh
Last verified November 14, 2026 · Reviewed by Sarah Johnson
Sample photo
- Agencies
- 2
- Typical weeks (sample)
- 4–10
- Documents
- 5
- Inspections
- 2
- Last checked
- November 14, 2026
Short answer
Yes. A new fire line off the public water main needs a flow test, an approved fire line plan and a connection permit. The flow test results go into the fire sprinkler design, so it comes first.
Agencies, in order
- NCDOT: encroachment agreement for the tap in a state roadState road only
- City of Raleigh: water and fire line connection permit
Documents checklist
PreparedForYes2
- Flow test request and results
- Water and sewer availability letter request (the utility issues it)
You1
- Contractor licence and insurance certificate
Licensed partner2
- Fire line plan with backflow preventer and meter vault
- Traffic control plan for work in the street
Steps
- Request the hydrant flow test and wait for the results.
- Give the results to the sprinkler designer and the design professional of record.
- File the fire line plan and connection application.
- Pay capacity and tap fees, then schedule the tap.
- Pass the pressure test and backflow inspection.
Inspections
- Hydrostatic pressure test
- Backflow preventer test and final
Fees, reviewer comments and sources
Fees
- Flow test feeSource: City of Raleigh: water and sewer connections[$___]
- Tap and capacity feesSource: City of Raleigh: water and sewer connections[$___]
Common reviewer comments
- Flow test is older than allowed; provide a current test.
- Show the backflow preventer location and access.
Sources
- City of Raleigh: water and sewer connections · checked November 14, 2026
Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.